If water leaks through your roof and onto ceiling sheetrock, you could wind up with a bowed or "wavy" ceiling. This wave occurs because sheetrock consists of compact gypsum powder. Dry, this gypsum powder can hold light loads. When this sheetrock gets wet, the gypsum powder crumbles and pulls away from the nail. When enough surface area pulls away from the nails, the ceiling sheetrock bows. You can't simply hammer more nails into the sheetrock because the gypsum has weakened and won't hold, so you must replace all damaged sheetrock panels. Done incorrectly, your ceiling will have gaps or might continue to bow. Done correctly, you will never know there was a problem.
Instructions
1. Raise and lock a sheetrock jack into place within 6 to 8 inches of the ceiling by setting the height latch lock.
2. Pry the loose, bowed sheetrock off the ceiling joists using a prybar while standing on a stepstool. Most of the sheetrock will remove in chunks and land on the sheetrock jack. The removed sheetrock will leave ceiling joists exposed.
3. Pull all exposed nails out of the exposed ceiling joists using a claw hammer.
4. Unlock the sheetrock jack's height latch lock and allow the jack to lower.
5. Dump the debris on sheetrock jack into a trashcan.
6. Raise a panel of sheetrock up to the ceiling joists using the sheetrock jack. Because you removed entire sheets of sheetrock, you can fit the new sheetrock panels into the open space.
7. Nail the sheetrock into place using the sheetrock hammer and sheetrock nails.
8. Nail the remaining sheetrock panels into place using the sheetrock jack, hammer and nails.
9. Swipe sheetrock mud into the seams between the sheetrock panels using the putty knife and the pre-mixed sheetrock mud. Wipe excess mud away using the flat edge of a putty knife and allow the mud to dry for 24 hours.
10. Press a strip of sheetrock tape into place along the mudded seams.
11. Swipe a 1/4-inch layer of sheetrock mud over the edges of the sheetrock tape using the putty knife and sheetrock mud. Use just enough mud to cover the tape's edges or you risk tearing the tape and having to re-tape the seams. Allow the mud to dry for 24 hours.
12. Re-mud any cracks that appear as a result of the mud drying and allow the mud to dry for 24 hours.
13. Re-paint your ceiling using matching paint and a paint roller.
Related posts
A utility knife can easily cut drywall paper.Sheet rock is an essential part of a finished room. It covers wiring, pipes, ducts and framing. Sheet rock can turn an unfinished house into a home. Le...
Drywall is a quick and easy ceiling making material.Tray ceilings are a detail feature in many homes and event spaces. Tray ceilings consist of a flat recessed drywall ceiling center, rimmed by a...
Wet Sand Sheet RockThere are several steps taken after installing new sheet rock walls or just replacing and repairing small pieces of sheet rock on a damaged wall. The most common way of finishin...
A mouse in the attic is an unwelcome guest.Mouse droppings collected on top of ceiling gypsum wall board -- a building material panel that is commonly called drywall or "sheet rock," aft...
Install new backing for shower walls if the old ones begin to sag or crumble.Cement backer boards are a type of sheetrock installed into walls with heavy water contact, such as shower stalls. This...