Wednesday, February 26, 2014

Apply Floor Progressing Compound

Create perfectly level floors with the application of a floor leveling compound.


When laying a new floor take care to assure that regardless of the materials used the floor is set in a level plane. A tilted floor, or one with dips and rises in it is difficult to cover with flooring materials. It can also act as a tripping hazard if the change in level is great over a short distance. For small, incrementally uneven surfaces, apply a floor leveling compound. This compound fills in dips and covers rises in the floor as well as filling in low sloping areas to create a new and level floor surface atop the old.


Instructions


1. Remove any baseboard or trim around the edges of the floor using a prybar. Place the tip of the prybar beneath the molding where it's secured to the wall with nails and lift the baseboard carefully from the wall. Set the boards aside for later replacement.


2. Sweep away any dirt or debris on the floor then mop the floor with a cleaner compatible with the current floor materials.


3. Brush a layer of epoxy adhesive across the surface of the floor to serve as a bonding agent between the leveling compound and the floor. Use a paintbrush to brush the thin layer of epoxy evenly onto the floor. Wait for the adhesive to dry. You want the adhesive to have just lost the wet look while retaining surface stickiness before applying the floor leveling compound.


4. Use a drill equipped with a mixing hook attachment to mix the leveling compound in a bucket according to the manufacturer's instructions. For best results, use a self-leveling compound that spreads across the surface, leveling itself in the process without the need for tooled finishing.


5. Spread the floor leveling compound over the surface of the floor. As you pour the compound, use a squeegee to spread it evenly. Pour a 2-inch thick covering of the compound. Allow the compound to set for four hours.


6. Pour additional layers of compound as needed, 2 inches at a time until you achieve the thickness desired, waiting four hours between each application. Wait an additional 48 hours after pouring the final layer for the compound to cure before using the floor.



Related posts



    If you're laying carpet, ceramic or vinyl floor covering over a plywood underlayment, before you start you should make sure the underlayment is completely flat. Plywood underlayment has seams betw...
    If you are going to tile or otherwise cover a concrete floor in your home and the surface is generally in good shape but contains some dips, depressions, holes or cracks, you need to get it filled...
    Without a level sub-floor, the finished product won't look rightConcrete sub-floors are notorious for having bumps and ridges, while wooden sub-floors can often be twisted out of shape by settling...
    Apply Joint Compound to Smooth Out WallsJoint compound is a type of plaster that's used to finish off the seams between sheets of drywall during construction. Applied correctly, it renders the sea...
    If you want to cover your cement basement floor with carpet, vinyl, wood or any other flooring, it’s important that the cement be flat and level. The concrete may be cracked or have dips and valle...